User guide
Operations
Load Ribbon
50
57512L-004 Rev. A 110PAX4/R110PAX4 User Guide 6/29/11
8. On the upper dancer assembly, squeeze the opening tabs (1) to pivot open the dancer
arm (
2).
9. Carefully thread the ribbon (1) through the upper dancer assembly, and then slowly
release the dancer arm (
2).
10. Place an empty ribbon core (1) onto the ribbon take-up spindle (2). Push the core toward
the print engine frame until it is fully seated.
Left-Hand Right-Hand
1
2
2
1
21
2 1