Specifications

Page 3-2 105SL Maintenance Manual 32056L Rev. 2 12/4/01
SECTION 3 TROUBLESHOOTING
The normal Power On Self Test sequence is as follows:
1. All lights turn on simultaneously and then turn off in sequence through
the following steps.
2. SRAM functionality test performed.
3. Option ROM functionality test performed. The words “Not Installed” is
added to the display if optional ROM is not used.
4. Printhead is checked for proper operation.
5. Processor functionality test performed. The word “Failed” is added to
the display if the test fails.
6. E-cubed functionality test performed. The word “Failed” is added to the
display if the test fails.
7. EEPROM/PROM functionality test performed. The word “Failed” is
added to the display if the test fails.
8. Optional PCMCIA Memory Card functionality test performed. The word
“Failed” is added to the display if the test fails.
9. Checking flash memory.
Depending on how the
MF (Media Feed) instruction is set, the printer
feeds to the first web or label length, calibrate ribbon and media
sensors, or set label length and feed one or more labels.
10. Printer is ready for operation. Refer to “Configuration” in Section 2 to
set specific parameters. Designate prompt language with the
KL
command or from the menu.
E-Cubed Test
EEPROM Test
Memory Card Test
CHECKING ON
BOARD FLASH
Printer Ready
4.0 MB VXX.X.X