User's Manual
Table Of Contents
As a prerequisite to installing beacon hardware, the following setup processes must be complete:
• MPact Server installation and setup is complete
For more information see, MPact Server Installation and Setup on page 2-1
• MPact Toolbox installation and setup is complete
For more information see, MPact Toolbox Installation and Setup on page 3-1
For information on beacon power usage and scalability, see Beacon Battery Life
For instructions on installing beacon and bracket hardware models on deployment site floors, see the following:
• Beacon Part Number: MPACT-T1B20-000-WR (Model # ATLS-T1B)
• Beacon Part Number: MPACT-T1B10-000-WR (Model # ATLS-T1B)
• Beacon Hardware Regulatory Information
Lozier Shelves
The brackets can be used on the following styles of Lozier shelves:
• Lozier TL Shelf
• DL Shelf
• HL Shelf
• Standard Base Deck
APPENDIX BEACON HARDWARE
INSTALLATION
DRAFT 2B - 12 June 2014