As a prerequisite to installing beacon hardware, the following setup processes must be complete:
MPact Server installation and setup is complete
For more information see, MPact Server Installation and Setup on page 2-1
MPact Toolbox installation and setup is complete
For more information see, MPact Toolbox Installation and Setup on page 3-1
For information on beacon power usage and scalability, see Beacon Battery Life
For instructions on installing beacon and bracket hardware models on deployment site floors, see the following:
Beacon Part Number: MPACT-T1B20-000-WR (Model # ATLS-T1B)
Beacon Part Number: MPACT-T1B10-000-WR (Model # ATLS-T1B)
Beacon Hardware Regulatory Information
Lozier Shelves
The brackets can be used on the following styles of Lozier shelves:
Lozier TL Shelf
DL Shelf
HL Shelf
Standard Base Deck