User's Manual
Table Of Contents
- 1 Introduction
- 2 Hardware Installation
- 3 Basic Access Point Configuration
- 4 AP-7522 Access Point Specifications
- 5 Regulatory Information
- 5.1 Regulatory Information
- 5.2 Wireless Device Country Approvals
- 5.3 Health and Safety Recommendations
- 5.4 RF Exposure Guidelines
- 5.5 Power Supply
- 5.6 Radio Frequency Interference Requirements—FCC
- 5.7 CE Marking and European Economic Area (EEA)
- 5.8 Statement of Compliance
- 5.9 Japan (VCCI) - Voluntary Control Council for Interference
- 5.10 Korea Warning Statement for Class B ITE
- 5.11 Other Countries
- 5.12 Waste Electrical and Electronic Equipment (WEEE)
- 5.13 TURKISH WEEE Statement of Compliance
- 6 Support
- 7 Symbol Technologies End-User Software License Agreement
- 8 AP-7522 Access Point China ROHS Compliance
Installation Guide 15
2.6 Suspended Ceiling T-Bar Mount Installation
Ceiling mount requires holding the AP-7522 up against a T-bar of a suspended ceiling grid and twisting the unit on
to the T-bar. If deploying the AP-7522 on a sculpted ceiling T-Bar, the Access Point mounting kit (Part No.
KT-135628-01) can optionally be used as well.
1. First install the mounting bracket on the T-bar then attach the mounting plate using the mounting slots on
the Access Point.
2. Cable the Access Point using either the Power Injector solution (AP-PSBIAS-2P3-ATR) or the approved
AP-7522 power supply (PWRS-14000-54R).