User's Manual
Table Of Contents
- 1 Introduction
- 2 Hardware Installation
- 3 Basic Access Point Configuration
- 4 AP-7522 Access Point Specifications
- 5 Regulatory Information
- 5.1 Regulatory Information
- 5.2 Wireless Device Country Approvals
- 5.3 Health and Safety Recommendations
- 5.4 RF Exposure Guidelines
- 5.5 Power Supply
- 5.6 Radio Frequency Interference Requirements—FCC
- 5.7 CE Marking and European Economic Area (EEA)
- 5.8 Statement of Compliance
- 5.9 Japan (VCCI) - Voluntary Control Council for Interference
- 5.10 Korea Warning Statement for Class B ITE
- 5.11 Other Countries
- 5.12 Waste Electrical and Electronic Equipment (WEEE)
- 5.13 TURKISH WEEE Statement of Compliance
- 6 Support
- 7 Symbol Technologies End-User Software License Agreement
- 8 AP-7522 Access Point China ROHS Compliance
Installation Guide 13
2.5.1 Wall Mount Procedure - New Installation
This section describes a new AP-7522 installation with no previous Access Point existing on the intended wall
surface.
1. Place the mounting bracket against the wall.
2. Mark the screw hole locations depending on the intended deployment orientation of the unit.
3. At each point, drill a hole in the wall and attach the mounting bracket.
4. Place the Access Point on the mounting bracket.
5. Cable the Access Point using either the Power Injector solution (AP-PSBIAS-2P3-ATR) or the approved
AP-7522 power supply (PWRS-14000-54R).
NOTE When pre-drilling a hole the recommended hole size is 4mm (0.16in.).