User's Manual

Table Of Contents
6 AP-7131 Access Point
1.2 Warnings
Read all installation instructions and site survey reports, and verify correct equipment installation before
connecting the Access Point.
Remove jewelry and watches before installing this equipment.
Verify the unit is grounded before connecting it to the power source.
Verify any device connected to this unit is properly wired and grounded.
Connect all power cords to a properly wired and grounded electrical circuit.
Verify that the electrical circuits have appropriate overload protection.
Attach only approved power cords to the device.
Verify that the power connector and socket are accessible at all times during the operation of the
equipment.
Verify there is adequate ventilation around the device, and that ambient temperatures meet equipment
operation specifications.
1.3 Site Preparation
Consult your site survey and network analysis reports to determine specific equipment placement, power
drops, and so on.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Ensure adequate, dust-free ventilation to all installed equipment.
Prepare Ethernet port connections.
Verify cabling is within the maximum 100 meter allowable length.
.