User's Manual

AP-7131 Access Point: Installation Guide
18
c. Ensure the cable length from the Ethernet source (host) to the Power Injector and
AP-7131 does not exceed 100 meters (333 ft). The Power Injector has no On/Off power
switch. The Power Injector receives power as soon as AC power is applied. For more
information on using the Power Injector, see “
Power Injector System” on page 6.
For standard power adapter (non Power Injector) and line cord installations:
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the AP-7131
GE1/POE or GE2 port.
b. Verify the power adapter is correctly rated according the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the AP-7131.
e. Attach the power supply line cord to a power supply.
15. Verify the behavior of the AP-7131 LED light pipe. For more information, see
“
LED Indicators” on page 19.
16. Place the ceiling tile back in its frame and verify it is secure.
17. The AP-7131 is ready to configure. For information on basic AP-7131 device configuration,
see “
Configuring “Basic” Device Settings” on page 24.
CAUTION Do not actually connect to the power source until the cabling portion
of the installation is complete.
!