Specifications
zBoost
®
ZB545 Manual
7
THIRD: Run the Coaxial Cable
NOTE: Refrain from securing cable or drilling
holes until the system has been tested.
Connect the supplied 35 feet of RG-6 coaxial
cable to the base of the External Antenna. Run
the coaxial cable along a descending pipe or
through a wall that leads closest to the location
of the Base Unit. Should you need additional
cable length, 15 foot extensions (Part #:
YX030-15w) are available at www.zBoost.com.
Please note: Cable longer than 65 feet is not
recommended.
FOURTH: Connect zBoost Base Unit
to Power
Connect the zBoost Base Unit to the power
supply and plug into a power outlet. When your zBoost system is in place and fully connected, walk
throughout your home and verify that you are able to reliably place calls. If the signal strength has
improved, your zBoost is working.
Upon initial power up, the LED will cycle RED, GREEN and ORANGE for 30 seconds. After 30
seconds, a series of GREEN ashes will indicate the quality of your setup. Following this, a solid
GREEN light indicates normal conditions. If it is not solid GREEN, follow the instructions in the
Base Unit LED Indicators section. Adjustments may be needed to optimize performance. If you nd
the increased signal coverage is acceptable, however, no additional adjustments are needed. See
“zBoost Base Unit Light Indicators” on page 10) for more information.
zBoost Base Unit
Power Supply
Indoor Antenna
Coaxial Cable
Wall Mounting
Bracket