Technical information
Machine Operation 25
DRV Operator’s Manual and Technical Reference (rev 1 0 June 30, 2000)
2.1.5 System Power On
Place the power switch on the operator’s console in the "ON" position. After the controller
diagnostic checks have completed, the power light will begin to blink.
2.1.6 Joystick Calibration
The operator joysticks should be calibrated at the beginning of each shift. With the "emergency
stop" placed in the "IN" position, place both the "left guard" and "right guard" toggle switches in
the down position simultaneously. The "guard up" light should illuminate when the calibration
procedure is complete.
Copyright 2011, AHMCT Research Center, UC Davis