Installation Sheet
1  of 2   
INSTALLATION INSTRUCTIONS 
Model 592F;593F 
Fig.1   
A
B
C
D
E
F
G
H
I
J
K
L
Fig. 2 
FIXTURE 
WIRES 
Black or 
Smooth 
HOUSE 
WIRES 
Black 
(Hot) 
FIXTURE 
WIRES 
White or 
Ribbed 
HOUSE 
WIRES 
White 
(Neutral) 
FIXTURE 
WIRES 
Bare 
Copper 
(Ground) 
HOUSE 
WIRES 
Green or 
Bare 
Copper(
Ground) 
FOR YOUR SAFETY WARNING: BE SURE THE ELECTRICITY TO THE WIRES YOU ARE WORKING ON IS SHUT OFF; EITHER 
THE FUSE IS REMOVED OR THE CIRCUIT BREAKER IS SHUT OFF.   
CAUTION: THE PRODUCT SHOULD BE INSTALLED BY A QUALIFIED ELECTRICIAN THAT IS AWARE OF THE CONSTRUCTION 
AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED 
GENERAL You don’t need special tools to install this fixture. Be sure to follow the steps in the order given. Under no 
circumstances should a fixture be hung on house electrical wires, nor should a swag type fixture be installed on a 
ceiling which contains a radiant type heating system. Read instructions carefully. If you are unclear as to how to 
proceed, consult a qualified electrician.   
NOTE: Proper wiring is essential for the safe operation of this fixture. 
MOUNTING THE FIXTURE (Fig. 1) 
1. Shut off the power at the circuit breaker and remove the 
old fixture, including the mounting hardware. 
2. Carefully unpack your new fixture and lay out all the 
parts on a clear area. Take care not to miss any small 
parts necessary for installation. 
3.  If  you  are  replacing  an  existing  fixture,  remove  and 
disconnect the old fixture 
4. Attach the mounting plate (C) to the outlet box (A) (not 
supplied) with the box screws (D). GND must face out. 
Connect the electrical wires as follow: 
5. Connect Black wire from the fixture to the black (hot) 
supply wire from outlet box; connect the white wire from 
the fixture to the white (neutral) house wire from outlet 
box. Make sure all wire nuts are secured properly. You may 
wrap the connections with electrical tape. If your outlet has 
a ground wire (green or bare copper). Connect fixture’s 
ground wire to it. Otherwise, connect fixture’s ground wire 
directly to the mounting plate using the green screw 
provided. Tuck the wire connections carefully into the 
outlet box. 
THE INSTALLATION (Fig.1) 
6.  Rise the fixture ceiling pan (E) onto the mounting plate 
(B) to be secured with ball knobs (F).  
7.  Install the bulb (Not provided) into E12 Candle base in 
accordance with the fixture’s specification. 
Install glass Shade (G) and the metal cross (K). (Fig.4) 
8.  Assemble the glass shade (G) to the fixture ceiling pan (E) . 
Then put gasket (H) and washer (I) at the bottom of the 
glass shade (G), after that, tighten them with hex nut (J) 
on the center rod. rise the bottom metal cross (K), secure 
it with the bottom finial(L) underneath the Glass shade. 
DO NOT EXCEED THE MAXIMUM WATTAGE 
RATING!   
Your installation is now complete. Return power to 
the 
junction box and test the fixture. 


