User Guide

8 10-1-2013
TERMINATION
Vertical Termination
• If the position of the roof terminal is specified, make a
hole in the roof:
• a) For terminal 60/100mm ( 2”/4”) and 80/125mm
(3”/5”) with a minimum of
140mm (5,5”) depending on the roof sloping;
• b) For terminal 110/16 0 m m (4”/6”) with a minimum
of 170mm (7”) depending on the roof sloping;
• For a good water seal, install the correct roof flashing on
the roof;
• Install the roof terminal vertically through the roof flashing
and fix them with the support to the inside of the roof;
• The roof terminal is now ready to connect with the other
vent parts.
Typical sloping roof situation
Typical flat roof situation