Install Instructions
Page 14 of 18 
INSTALLING Z-VENT
  INTO AN EXISTING MASONRY CHIMNEY 
A masonry chimney flue may be used to route Z-Vent through provided that no other appliance is vented directly 
into the same flue without a chimney liner. 
¾  Prior to beginning the installation make certain that the existing chimney meets all national and local building codes. 
¾  The chimney must be cleaned, removing all soot, debris and creosote before installing Z-Vent. 
¾  It is recommended to have the vent stack supported from the bottom so that the system is in compression. 
¾  Prepare and install the “preferred” support for receiving the vent system at the bottom of the stack. 
¾  Following the joint procedure (pg. 5, 6) connect the bottom fitting / pipe together.  Implementing “best practice” and / or 
“preferred” methods assemble the vent system while lowering the flue downwards into the chimney onto the support.  
¾ 
Prepare the chimney cap to receive the Z-Vent  Flashing. Install the flashing over the last length of pipe down to the 
chimney cap.
¾  Loosely attach the Z-Vent  Top Support / Storm Collar to the pipe directly above the flashing leaving approximately 6 
inches of pipe for the vertical termination connection and any breaching adjustment. 
¾  Fasten the Z-Vent Flashing to chimney top using caulking and/or screws. If the top clay tile is still in place, the corners of 
the flashing should be notched and flashing plate formed down around clay tile. 
¾  Install the Z-Vent  Vertical Termination. Adjust the top support and tighten the collar. Apply sealant to upper edge 
where the top support collar meets the pipe. 
NOTICE 










