User manual

Z Corporation Z406 System User Manual
98 Z Corporation Service (781)852-5050/(877)88-ZCORP
For more information, please refer to Section 8, Changing Material Systems.
Deck Adjustment
Place the removable build plate onto the build piston and adjust the build height as described
below:
Place the build plate on top of the build piston. Use the build up button to raise the piston all the
way to the top. Use a straight edge to view the clearance between the build plate and the top
deck. Adjust the build up and down arrows on the control panel so that the clearance is
approximately 1/16 in (1.6 mm) below the top deck.
Build Plate
Deck adjustment with straight edge