User manual
Spectrum Z510 User Manual
www.zcorp-users.com
36
3. Turn on air compressor.
4. Change air pressure as needed and
check pressure with hand before
applying air on part.
Technical Tip -The air pressure on your
depowdering station is adjustable. For
bulky parts, turn the air pressure up. For
more delicate parts, turn the air pressure
down.
5. Remove excess powder from part.
5.5 Drying the Part
Although the part can be handled when it is not completely dried, the part reaches full strength
when dried. Placing the part in an oven at temperatures less than 200°F (93
o
C) for 2-4 hours
will dramatically increase the strength of the part. This is only recommended for high definition
composite powders. If using the removable build plate, remove the part from the removable
build plate before placing in the oven.
5.6 Part Infiltration
All parts can be infiltrated with a variety of resins to produce a range of material properties. As
an early stage design tool, it may not be necessary to infiltrate the parts at all. However, the
true versatility of the Spectrum Z510 System is derived from the variety of material properties
that can be achieved by applying one of our infiltration materials to parts that will be exposed to
a variety of product testing environments. For additional information on how Z Corp. customers
are utilizing our line of infiltration products visit our user group website at www.zcorp-users.com
.