Declaration of Conformity
English
3 – 4
Description Assembly/operation
LEDs for the groups
(A, B, C, D)
Buttons for the group selection
Manual release button
Increasing the performance
- Tap: Light performance is increased in . steps
- Keep pressed down: Switching to modelling light by tapping
the performance of the modelling light is increased
Reducing the performance
- Tap: Light performance is reduced in . steps
- Keep pressed down: Switching to modelling light by tapping
the performance of the modelling light is reduced
Base connector
DIP switch in the battery compartment for setting the channel
Battery compartment with lithium battery CR
Switch off the camera and ST- before assembly or disassembly.
Turn the knurled nut fully against the ST- .
The locking pin in the base connector is now fully inserted into the
trigger housing.
Slide the Studio Trigger with the base connector to the stop in the
accessory shoe on the camera.
Turn the knurled screw against the camera body until it clicks into
place and clamp the ST-.
On camera bodies without a locking hole, the spring-mounted lock-
ing pin sinks into the housing of the Studio Trigger, as a result the
surface is not damaged.
For disassembly, proceed in the reverse order.
Observe the safety instructions before start-up! Switch o the Studio
Trigger before assembly or disassembly.
.
.
.
.