User manual

Installation System 182-XT-4
3 - 10
ba76027e02 12/2014
NOTE
For optimum stability only one MIQ module may be attached to the
DIQ/S 182 XT-4-PR.
Materials required 2 x ISO blind nuts (M4)
2 x cheese-head screws (M4x16) with plastic washer
1 x contact base with two plastic tapping screws (scope of delivery
of the MIQ module).
Tools Phillips screwdriver.
Both installation variants of the attachment of an MIQ module on the
DIQ/S 182 XT-4 is described in the following. The assembly of further
MIQ modules is carried out analogously. To dismantle a stack, proceed
in the reverse order to mounting.
3.4.2 Variant 1: Stack expansion forwards
Preparing the stack
mounting
Fig. 3-2 Preparing components for stack mounting (variant 1)
In all MIQ modules in the System 182 XT-4 the terminator
switch on the terminal strip must be set to "Off".
For stack mounting remove label
and install contact carrier
13
24
MIQ module
DIQ/S 182 XT-4_PR