Installation guide
Hardware Operation Manual
50
Insert Battery pack 3 pin connector into Battery Board (ARC8006-2) JA2 connector,
JA2 location shown as in bellow:
Put back the top cover of the Controller module
4U RAID system please check “BBM Installation Procedures V1.0.pdf”
(Y3-24S6E)
Note: PCIe-SAS Controller’s 3 pin BBM connector is JP1
Battery Backup Capacity
Battery backup capacity is defined as the maximum duration of a power failure for which
data in the cache memory can be maintained by the battery. The BBM’s backup capacity
varied with the memory chips that installed on the external RAID controller.
Capacity
Memory Type
Battery Backup duration(Hours)
1GB Memory
Normal
150
2GB Memory
Normal
100










