Specifications

7
FORM 160.80-NOM1
YORK INTERNATIONAL
FIG. 1 – MODEL YS, STYLE E ROTARY SCREW LIQUID CHILLER
SECTION 1 – INSTALLATION
GENERAL
This instruction describes the installation of a Model YS
Rotary Screw Liquid Chiller. (See Figure 1.) This unit
is shipped as a single factory assembled, piped, wired
and nitrogen or refrigerant charged package (Form 1
shipment). This unit requires a minimum of field labor
to make chilled water connections, condenser water con-
nections, refrigerant atmospheric relief connections, and
electrical power connections.
YS units can also be shipped dismantled when required
by rigging conditions, but generally it is more economi-
cal to enlarge access openings to accommodate the fac-
tory assembled unit.
The YS Chiller may be ordered and shipped in the fol-
lowing forms:
Form 1 Factory Assembled Unit, Complete with
Motor and Refrigerant and Oil Charges as
discussed in this instruction.
Form 2 Factory Assembled (same as Form 1) ex-
cept not charged with oil or refrigerant.
Shipped with holding charge of nitrogen. Re-
frigerant shipped in 50 and 125 lb. cylinders.
Form 3 Driveline Separate From Shells – Shipped
as three major assemblies.
Form 7 Split Shells – Shipped as four major as-
semblies.
Units shipped dismantled MUST be
reassembled by, or under the supervi-
sion of a YORK representative. Refer
to Form 160.80-N1 for detailed in-
structions of Form 3 and 7 shipments.
MOTOR
MOTOR TERMINAL BOX
COMPRESSOR
RUPTURE
DISK
RELIEF VALVE
OIL
SEPARATOR
GRAPHIC
CONTROL
CENTER
COOLER
SIGHT GLASS
RELIEF VALVE
CONDENSER
00202VIP
1