Technical data
4.21 Status Connections 4.8
4.21.1 Remote Mode - Ready to Start
4.21.2 Run Contacts
4.21.3 Anticipatory Alarm
4.21.4 Cycling Shutdown
4.21.5 Safety Shutdown
4.22 Pump Control Connections 4.9
4.22.1 Chilled Liquid Pump
4.22.2 Cooling Liquid Pump
4.23 Thermal Insulation 4.9
4.24 Installation Check 4.9
5 COMMISSIONING
5.1 Preparation 5.1
5.2 First Time Start-up 5.2
6 OPERATION
6.1 General 6.1
6.2 Pre-Startup 6.1
6.3 Start-up 6.1
6.4 Normal Operation 6.2
6.5 Shutdown 6.2
6.6 Manual Shutdown 6.2
6.7 Prolonged Shutdowns 6.3
6.8 Operating Inspections 6.3
6.9 Operating Log Sheet 6.4
6.10 Maintenance and Service 6.4
6.10.1 Normal and Safety System Shutdowns
7 MAINTENANCE
7.1 Scheduled Maintenance 7.1
7.1.1 Check the oil and refrigerant levels - Weekly
7.2 Special Maintenance Requirements 7.2
7.3 Regular Maintenance Operations 7.3
7.4 Oil Filters and Driers 7.4
7.4.1 Single Oil Filter Replacement
7.4.2 Dual Oil Filters
7.4.3 Filter Drier Replacement
7.5 Oil Charging 7.5
7.5.1 Oil charging procedure
7.6 Refrigerant Charge 7.5
7.6.1 Checking The Refrigerant Charge
7.6.2 Leak Testing
7.6.3 Vacuum Testing
7.6.4 Refrigerant Charging
7.7 Evaporator and Condenser 7.6
7.7.1 Chemical Water Treatment
7.7.2 Tube Cleaning
7.7.3 Tube Cleaning Procedures
7.7.4 Tube Leaks
7.7.5 In-Service Inspection
7.8 Electrical Controls 7.8
7.9 Testing Motor Winding Insulation 7.9
8 TROUBLE SHOOTING
8.1 General Requirements 8.1
8.2 Trouble Shooting 8.1
9 TECHNICAL DATA
9.1 Dimensions 9.1
9.2 Solid State Starter Details 9.2
9.3 Weights 9.2
9.4 Process and Instrumentation Diagram 9.3
9.5 Water Box Nozzle Arrangements 9.4
10 SPARE PARTS
11 DE-COMMISSIONING, DISMANTLING AND
DISPOSAL
11.1 General 11.1
I-ii 160.81-ICOM-GB0 (01/02)