b. Select the position of installation hooks according to the hook holes on the installation board.
Drill four holes of 12 mm., 45 ~ 50 mm. deep at the selected positions on the ceiling. Then embed the expandable
hooks (fittings).
Face the concave side of the installation hooks toward the expandable hooks. Determine the length of the
installation hooks from the height of ceiling, then cut off the unnecessary part.
If the ceiling is extremely high, determine the length of the installation hook according to facts.
For size 12-18 provide access for control box.
A
A
The length could be calculated from Chart 5.
Length=H-181+L (in general, L=100 mm. and is half of the whole length of the installation hook)
c. Adjust the nuts on the four installation hooks evenly to ensure the balance of the body.
If the drainpipe is awry, leakage will be caused by the malfunction of the water-level switch.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The bodyʼs lower
part should sink into the ceiling for 10 ~ 12 mm. (Refer to chart 5).
Locate the air conditioner firmly by adjusting the nuts.
Necessary room
>2500 mm.
Chart 1
ground
outlet inlet outlet
Note: 12000-24000 Btu/h Series A ≥ 260 mm.
30000-48000 Btu/h Series A ≥ 330 mm.
Body
Nut
Ceiling
880 mm.
Hook
B
Panel
Chart 2
Note: 12000-24000 Btu/h Series B ≥ 240 mm.
30000-48000 Btu/h Series B ≥ 310 mm.
>1000 mm.
>1000 mm.
>1000 mm.
>1000 mm.
Note: The dimension of 24000 Btu/h and 30000 Btu/h (3 PHASE) are the same.
The dimension of 30000 Btu/h and 36000 Btu/h (1 PHASE) are the same.
Chart 3 Chart 5
Body
Bolt
M6 x 12
Installation paper board
Central hole
Chart 4
(Unit : mm.)
950 (Panel)
880 (Ceiling hole)
840 (Body)
780 (Hook-location)
780 (Hook-location)
840 (Body)
880 (Ceiling hole)
950 (Panel)
Tubing sideDrain side
Ceiling
H (Ceiling height)
Chart 6
Body
34 mm.
10-12 mm.
136 mm.
Chart 7