Owner`s manual
13
ENGLISH
b. Select the position of installation hooks according to the hook holes on the installation board.
•
Drill four holes of 12 mm., 45 ~ 50 mm. deep at the selected positions on the ceiling. Then embed the expandable
hooks (fittings).
• Face the concave side of the installation hooks toward the expandable hooks. Determine the length of the
installation hooks from the height of ceiling, then cut off the unnecessary part.
• If the ceiling is extremely high, determine the length of the installation hook according to facts.
• For size 12-18 provide access for control box.
A
A
The length could be calculated from Chart 5.
Length=H-181+L (in general, L=100 mm. and is half of the whole length of the installation hook)
c. Adjust the nuts on the four installation hooks evenly to ensure the balance of the body.
• If the drainpipe is awry, leakage will be caused by the malfunction of the water-level switch.
•
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The bodyʼs lower
part should sink into the ceiling for 10 ~ 12 mm. (Refer to chart 5).
• Locate the air conditioner firmly by adjusting the nuts.
Necessary room
>2500 mm.
Chart 1
ground
outlet inlet outlet
Note: 12000-24000 Btu/h Series A ≥ 260 mm.
30000-48000 Btu/h Series A ≥ 330 mm.
Body
Nut
Ceiling
880 mm.
Hook
B
Panel
Chart 2
Note: 12000-24000 Btu/h Series B ≥ 240 mm.
30000-48000 Btu/h Series B ≥ 310 mm.
>1000 mm.
>1000 mm.
>1000 mm.
>1000 mm.
Note: The dimension of 24000 Btu/h and 30000 Btu/h (3 PHASE) are the same.
The dimension of 30000 Btu/h and 36000 Btu/h (1 PHASE) are the same.
Chart 3 Chart 5
Body
Bolt
M6 x 12
Installation paper board
Central hole
Chart 4
(Unit : mm.)
950 (Panel)
880 (Ceiling hole)
840 (Body)
780 (Hook-location)
780 (Hook-location)
840 (Body)
880 (Ceiling hole)
950 (Panel)
Tubing sideDrain side
Ceiling
H (Ceiling height)
Chart 6
Body
34 mm.
10-12 mm.
136 mm.
Chart 7
J391_EN.indd 13 3/14/07 1:32:48 PM










