Specifications

JOHNSON CONTROLS
2-18
FORM 102.20-N1 (1109)
Installation
FIG. 2-24 – REMOVE AND REPOSITION SHIPPING
SPLIT ANGLE
SECURE TOGETHER USING 3/8" X 3/4"
BOLT, LOCK WASHER & HEX NUT.
REMOVE SHIPPING
BRACKETS
HEAT WHEEL (ER) SEGMENT
END SPLIT MOUNTING BRACKET
FIG. 2-23 – ASSEMBLY OF END CHANNEL SHIPPING SPLIT (EXPANDED CABINET)
LD14262
2. Place the rst section in its nal position and
anchor or block it before placing the next section
(see Fig. 2-25).
After wiring connections are made
and before proceeding with assembly,
the top shipping split angle will need
to be removed and repositioned (see
Fig. 2-24).
Remove Shipping Split Angle
after completion of wiring and
tubing placement and
reposition before proceeding
with assembly of shipping
splits.
Remove Shipping Split Angle
after completion of wiring and
tubing placement and
reposition before proceeding
with assembly of shipping
splits.
LD14097