Technical data

3 TRANSPORTATION, HANDLING
AND STORAGE
YCWM/YCRM series chillers are supplied fully
assembled.
YCWM units are pre-charged with refrigerant and
oil in the correct quantity required for operation.
YCRM units include a nitrogen holding charge and
are pre-charged with oil in the correct quantity
required for operation.
The refrigerant circuit on YCRM units
must be charged before the unit is
operated.
3.1 Inspection
Immediately upon receiving the unit, it should be
inspected for possible damage which may have
occurred during transit as goods are shipped ex-
works at purchaser's risk. In addition, ensure that
all ordered components have been received.
If any damage is evident, it should be noted on the
carrier's freight bill and a claim entered in
accordance with the advice note instructions. If the
damage is other than superficial, immediately
advise your local York representative.
York accepts no responsibility for shipping
damage, even in cases where the factory has
arranged for shipping.
3.2 Handling
Models 60 to 150 are designed to be lifted using a
fork lift truck.
Models 170 to 280 are designed to be lifted using
lifting lugs and cables. A spreader bar or frame
should be used with the cables, to avoid damaging
the unit.
Before moving the unit ensure that the installation
site is suitable to receive the unit and to support its
weight and mechanical impact.
During handling the unit should not be inclined from
the vertical.
Care should be taken to avoid damaging
the paneling when lifting and moving the
unit to the installation site. The sides of the
unit should be protected with stiff
cardboard or plywood.
Do not remove the protective packaging
until the unit is ready for operation.
035B40022-000 3-1