Instruction Manual


4-2
IM 01R04B04-00E-E 8th edition March 01, 2011 -00
All Rights Reserved. Copyright © 2003, Rota Yokogawa

1. The upstream and downstream piping length has no inuence on the functioning of the instrument.
2. Piping requirements for proper operation :
A Coriolis mass owmeter can be installed vertically, horizontally or at any angle from the horizontal
position.
However, the piping must be installed to ensure that the measuring tube is always lled with liquid.
The position of installation of the detector is arbitrary. A vertical mounting is recommended however.
IMPORTANT
When the following notes are not observed, ow measurements may not be correct and can damage the
instrument. Please make correct piping design in accordance with the present guidelines.
IMPORTANT
Please be careful to install the owmeter not too close to motors, transformers, inverters and other powerand other power
source, induction failure may occur.


The detector RCCS30 to 33 can be mounted on a 2-inch pipe (option /PD) with a bracket and U-bolt assy.