Owner manual
IM 1M12A01-05E
ii
This manual consists of twelve chapters. Please refer to the reference chapters for
installation, operation and maintenance.
T.Int.2E
s
s
s
s
n
s
s
s
n
n
n
n
n
n
n
s
s
s
s
s
s
s
References
Chapter Outline Installation Operation Maintenance
1. Overview Equipment models and system configuration examples
2. Specifications Standard specification, model code (or part number),
dimension drawing for each equipment
3. Installation Installation method for each equipment
4. Piping Examples of piping in three standard system
configurations
5. Wiring Wiring procedures such as Power supply wiring , output
signal wiring or others
6. Components These are described in this manual
7. Startup Basic procedure to start operation of EXAxt ZR. Chapter 7
enables you to operate the equipment immediately.
8. Detailed Data Setting Details of key operations and displays
9. Calibration Describes the calibration procedure required in the course
of operation.
10. Other Functions Other functions described
11. Inspection and How to conduct maintenance of EXAxt ZR and procedures
Maintenance for replacement of deteriorated parts
12. Troubleshooting This chapter describes measures to be taken when an
abnormal condition occurs.
CMPL (parts list) User replaceable parts list
s
s
n
: Read and completely understand before operating the equipment.
: Read before operating the equipment, and refer to whenever necessary.
: Recommended to read at least once.
s
n
n
n
s
s
s