User Manual

<2. Instruction for Replacement of the Heater Unit>
2-2
IM 11M12A01-21E
CAUTION
If the heater strut assembly cannot be removed because a screw has fused to its thread, one of our
service representatives can x it.
2.1.2 Replacement of the Heater Unit
1. Removing of the Sensor (Cell)
Remove the U-shaped pipe support, the U-shaped pipe, the Filter and the Sensor (Cell) according to
Sec. 2.1.1 “Removal procedures for Sensor Assembly”.
2. Removing of the Terminal Box
(1) Open the terminal box and remove the three terminal connections (CELL+, TC+ and TC-).
(2) To disconnect the HTR terminals, remove the terminal block screw . The other terminal
connections remain connected; disconnect the two HTR connections. (These terminals have no
polarity.)
(3) Remove the two screws that fasten the cover and slide it to the ange side.
(4) Remove the four bolts and the terminal box with care so that the already disconnected wire
will not get caught in the terminal box.
3. Replacement of Heater Strut Assembly
(1) Loosen screw until heater strut assembly’s plate can be removed. There’s no need to
remove O-ring which prevents screw from coming out. Pull out connector .
(2) Loosen and remove the screw with a special tool (part no. K9470BX or equivalent) and then
remove the heater strut assembly from the detector .
(3) To reassemble the heater strut assembly, reverse the above procedure:
Insert the heater strut assembly into the detector , while inserting the calibration pipe in
the detector into the heater section in the heater strut assembly as well as in the bracket
hole. Coat the screw with grease (NEVER SEEZ: G7067ZA) and tighten the screw with a
special tool (part no. K9470BX or equivalent) with a tightening torque of 12N · m ±10%. (screw
attached with heater strut assembly is shipped with coating.)
4. Assembling of Connector
(1) To install the O-rings on the calibration gas and reference gas pipes, disassemble the
connector in the following procedure.
Remove the screw and then remove the plate and two caps . If the O-ring remains in
the hole, pull them out from the back.
(2) Pass the heater and thermocouple lead-wire through the connector . Also, pass the calibration
gas and reference gas pipes through the holes of the connector .
(3) Insert the calibration gas and reference gas pipes into O-rings after conrming no damage to
O-rings. If the O-ring fails, replace it with a new one.
(4) Push the two caps into the associated opening of the connector . Insert the plate ,
aligning it with the groove of the cap , and tighten it with the screw . If you attempt to insert
the calibration gas and reference gas pipes into the connector without disassembling the
connector , the O-ring may be damaged.
(5) Tighten the screw in heater strut assembly until connector cannot move.