Owner manual
Table Of Contents
- Introduction
- CONTENTS
- 1. Overview
- 2. Specifications
- 2.1 General Specifications
- 2.2 General use Separate type Detector and Related Equipment
- 2.3 Separate type Detector for High Temperature and Related Equipment
- 2.4 ZR402G Separate type Converter
- 2.5 ZA8F Flow Setting Unit and ZR40H Automatic Calibration Unit
- 2.6 ZO21S Standard Gas Unit
- 2.7 Other Equipments
- 2.7.1 Dust Filter for the Detector (K9471UA)
- 2.7.2 Dust Guard Protector (K9471UC)
- 2.7.3 Ejector Assembly for High Temperature (E7046EC, E7046EN)
- 2.7.4 Stop Valve (L9852CB, G7016XH)
- 2.7.5 Check Valve (K9292DN, K9292DS)
- 2.7.6 Air Set
- 2.7.7 Zero Gas Cylinder (G7001ZC)
- 2.7.8 Cylinder Pressure Reducing Valve (G7013XF, G7014XF)
- 2.7.9 Case Assembly for Calibration Gas Cylinder (E7044KF)
- 2.7.10 ZR22A Heater Assembly
- 3. Installation
- 3.1 Installation of General-purpose Detector
- 3.2 Installation of High Temperature Detector (ZR22G-015)
- 3.3 Installation of the ZR402G Converter
- 3.4 Installation of ZA8F Flow Setting Unit
- 3.5 Installation of ZR40H Automatic Calibration Unit
- 3.6 Installation of the Case Assembly(E7044KF)
- 3.7 Insulation Resistance Test
- 4. Piping
- 5. Wiring
- 6. Components
- 7. Startup
- 7.1 Checking Piping and Wiring Connections
- 7.2 Checking Valve Setup
- 7.3 Supplying Power to the Converter
- 7.4 Touchpanel Switch Operations
- 7.5 Confirmation of Converter Type Setting
- 7.6 Confirmation of Detector Type Setting
- 7.7 Selection of Sample Gas
- 7.8 Output Range Setting
- 7.9 Setting Display Item
- 7.10 Checking Current Loop
- 7.11 Checking Contact I/O
- 7.12 Calibration
- 8. Detailed Data Setting
- 9. Calibration
- 10. Other Functions
- 11. Inspection and Maintenance
- 12. Troubleshooting
- Customer Maintenance Parts List CMPL 11M12A01-02E
- Customer Maintenance Parts List CMPL 11M12C01-01E
- Customer Maintenance Parts List CMPL 11M12A01-11E
- Customer Maintenance Parts List CMPL 11M03B01-10E
- Customer Maintenance Parts List CMPL 11M03B01-05E
- Customer Maintenance Parts List CMPL 11M03D01-01E
- Revision Information

<4. Pipomg>
4-4
IM 11M12A01-02E 8th Edition : Jan.13,2012-00
If the temperature of the sample gas exceeds the specied value and its pressure exceeds 0.49 k
Pa, the sample gas temperature may not be below 700 °C at the detector.
In such a case, connect a needle valve (found on the local market) through a nipple (also found
on the local market) to the probe adapter sample gas exhaust (Rc 1/2) so that the sample gas
exhaust volume is restricted.
Reducing nipple
(R1/2-R1/4 or R1/2-1/4NTP)
Needle valve
F4-4E.ai
Figure 4.4 Mounting the needle valve for restricting exhaust ow of the sample gas
In cases where condensation is likely to occur in the probe adapter when the sample gas is
cooled, protect the probe adapter with an insulating material as illustrated in Figure 4.5.
Sample gas outlet
Cover flange
Adapter for high temperature probe
Detector
Insulating material
Probe
F4-5E.ai
Figure 4.5 Preventing to condensation
If the sample gas is to be vented at a distance from the detector because no reference gas piping
can be provided, an exhaust pipe should be installed as illustrated in Figure 4.6.
In addition, the exhaust pipe shall be kept warm to protect against condensation.
Exhaust pipe
Rc1/2
Use thick piping for exhaust.
Horizontal part should be kept to the
minimum to maintain piping strength.
F4-6E.ai
Figure 4.6 Exhaust pipe