Owner manual
Table Of Contents
- Introduction
- CONTENTS
- 1. Overview
- 2. Specifications
- 2.1 General Specifications
- 2.2 General use Separate type Detector and Related Equipment
- 2.3 Separate type Detector for High Temperature and Related Equipment
- 2.4 ZR402G Separate type Converter
- 2.5 ZA8F Flow Setting Unit and ZR40H Automatic Calibration Unit
- 2.6 ZO21S Standard Gas Unit
- 2.7 Other Equipments
- 2.7.1 Dust Filter for the Detector (K9471UA)
- 2.7.2 Dust Guard Protector (K9471UC)
- 2.7.3 Ejector Assembly for High Temperature (E7046EC, E7046EN)
- 2.7.4 Stop Valve (L9852CB, G7016XH)
- 2.7.5 Check Valve (K9292DN, K9292DS)
- 2.7.6 Air Set
- 2.7.7 Zero Gas Cylinder (G7001ZC)
- 2.7.8 Cylinder Pressure Reducing Valve (G7013XF, G7014XF)
- 2.7.9 Case Assembly for Calibration Gas Cylinder (E7044KF)
- 2.7.10 ZR22A Heater Assembly
- 3. Installation
- 3.1 Installation of General-purpose Detector
- 3.2 Installation of High Temperature Detector (ZR22G-015)
- 3.3 Installation of the ZR402G Converter
- 3.4 Installation of ZA8F Flow Setting Unit
- 3.5 Installation of ZR40H Automatic Calibration Unit
- 3.6 Installation of the Case Assembly(E7044KF)
- 3.7 Insulation Resistance Test
- 4. Piping
- 5. Wiring
- 6. Components
- 7. Startup
- 7.1 Checking Piping and Wiring Connections
- 7.2 Checking Valve Setup
- 7.3 Supplying Power to the Converter
- 7.4 Touchpanel Switch Operations
- 7.5 Confirmation of Converter Type Setting
- 7.6 Confirmation of Detector Type Setting
- 7.7 Selection of Sample Gas
- 7.8 Output Range Setting
- 7.9 Setting Display Item
- 7.10 Checking Current Loop
- 7.11 Checking Contact I/O
- 7.12 Calibration
- 8. Detailed Data Setting
- 9. Calibration
- 10. Other Functions
- 11. Inspection and Maintenance
- 12. Troubleshooting
- Customer Maintenance Parts List CMPL 11M12A01-02E
- Customer Maintenance Parts List CMPL 11M12C01-01E
- Customer Maintenance Parts List CMPL 11M12A01-11E
- Customer Maintenance Parts List CMPL 11M03B01-10E
- Customer Maintenance Parts List CMPL 11M03B01-05E
- Customer Maintenance Parts List CMPL 11M03D01-01E
- Revision Information

<2. Specications>
2-19
IM 11M12A01-02E 8th Edition : Jan.13,2012-00
● External Dimensions
F2-6_2E.ai
Unit: mm
OCK
140
250
42
26
41.2 41.2
54 71.526
49.5
12223
46 16
3040 47.5 25
102 MAX58
90 116.5
*1 with four ISO M6 screws can wall-mount
*1
4 - Ø6.5
(wiring inlet is at same position on rear)
Flowmeter
Needle valve
2B mounting pipe
Connection port
Setting Valve for
calibration gas
Setting Valve for
reference gas
Wiring inlet ; 2-G1/2,Pg13.5,M20X1.5 or 1/2NPT(Female)
Calibration gas outlet
Rc1/4 or 1/4 NPT(Female)
Zero gas inlet
Rc1/4 or 1/4 NPT(Female)
Reference gas inlet
Rc1/4 or 1/4 NPT(Female)
Rc1/4 or 1/4 NPT(Female)
Reference gas outlet
2B pipe mounting example
Terminal box
• Piping Diagram
ZR402G Converter
ZR40H Automatic
Calibration Unit
AC-Z
AC-C
AC-S
Zero
Span
F35_00.ai
EV1
EV2
CHECK
OUT
ZERO GAS IN
AIR IN
Instrument air Approx. 1.5 l/min
*2
Needle valve is supplied as on accessory with flowmeter
Flowmeter
Flowmeter
REF
OUT
*2 *2
Solenoid valve
EV1,2
EV1 EV2
F2-6_3E.ai