User guide
<5. INSTALLATION AND WIRING> 5-5
IM 11Y01B01-01E-A 6th Edition :Feb 13, 2013-00
5.4 Process Flange Clear Aperture
The Launch and Detect unit anges (and insertion tubes if used) should be installed in such a way that a
minimum clear through aperture (opening) diameter of 1 ½” (38 mm) when the distance between the 2” 150#
ange faces does not exceed 6ft (~2 m).
Note: Larger clear through apertures may be required when operating over longer distances –
CONSULT FACTORY for further details.
5.5 Mounting the Launch and Detect Units to the Process Flange
Securely bolt the Launch and Detect Units to the process anges using the standard bolt holes provided. Ensure
the correct size bolts, nuts, and gasket are used in accordance with the ange specications and in accordance
with the process specications when applicable.
NOTE: If the process isolation valve ange is excessively hot due to the process temperature or radiant
heat, then a thermal insolating ange gasket should be used in order to minimize the heat transfer to the
analyzer ange face.
It is generally benecial to make the ange of the Launch and Detect Units and the ange of the process
concentric with each other. Due to the large clearance provided by standard anges and bolts, it is possible to
mount the two anges in an un-concentric manner – this should be avoided to aid laser beam alignment.
Figure 28 - Clear Aperture for Launch or Detect Unit Flanges
2
All Rights Reserved. Copyright © 2011, Yokogawa Electric Corporation. Subject to change without notice. January 2011IM 11A00V01-01E-A
Operating and Maintenance Manual
1. Introduction ................................................................................................... 4
1.1 Features ................................................................................................ 4
2. General Specications .................................................................................5
3. Theory of Operation...................................................................................... 6
3.1 Brief History of Reux Samplers ...................................................... 6
3.2 Filter Section ..................................................................................... 6
3.3 Steam Supplement ........................................................................... 6
3.3 Inlet Temperature Section ................................................................ 6
3.4 Heat Exchanger Section ...............................................................6-7
3.5 Outlet Temperature Section ............................................................. 7
3.6 Self Acting Temperature Controller ..................................................7
3.7 Instrument Air for the Vortex Tube ................................................... 7
3.8 Vortex Theory of Operation .............................................................. 7
4. Utility Requirements ..................................................................................... 8
4.1 Instrument Air ................................................................................... 8
4.2 Low Pressure Steam ........................................................................ 8
5. Installation ..................................................................................................... 9
5.1 Mechanical Considerations .............................................................. 9
5.2 Fast Loop Line Size and Response Times ..................................... 9
5.3 Insulation ..........................................................................................9
6. Start-Up .......................................................................................................10
7. Operation .................................................................................................... 11
7.1 Vortex Tubes ................................................................................... 11
7.2 Steam Injection ............................................................................... 11
7.3 Controller ........................................................................................ 11
8. Maintenance ...............................................................................................12
8.1 Filter Section and/or Heat Exchanger Cleaning .......................12-13
9. Trouble Shooting ........................................................................................14
9.1 Vortex Tubes ...................................................................................14
10. Sub-Component Documentation ............................................................. 15
10.1 Vortex Tube Installation and Maintenance .............................15-17
10.2 Installation and Maintenance for SA Control Valve ...............18-24
11.2.1 General Safety ................................................................ 19
11.2.2 Tech. Details ...................................................................19
11.2.3 Install and Commiss ..................................................20-22
11.2.4 Maintenance ..............................................................23-24
10.3 Supplement Safety Information ................................................... 25
10.3.1 Intended Use ..................................................................25
The following safety symbols are used on
the product as well as in this manual.
DANGER
This symbol indicates that an operator
must follow the instructions laid out in
this manual in order to avoid the risks, for
the human body, of injury, electric shock
or fatalities. The manual describes what
special care the operator must take to
avoid such risks.
WARNING
This symbol indicates that an operator must
refer to the instructions in this manual in
order to prevent the instrument (hardware)
or software from being damaged, or a
system failure from occurring.
CAUTION
This symbol gives information essential
for understanding the operations and
functions.
Note!
This symbol indicates information that
complements the present topic.
2
All Rights Reserved. Copyright © 2011, Yokogawa Electric Corporation. Subject to change without notice. January 2011IM 11A00V01-01E-A
Operating and Maintenance Manual
1. Introduction ................................................................................................... 4
1.1 Features ................................................................................................ 4
2. General Specications .................................................................................5
3. Theory of Operation...................................................................................... 6
3.1 Brief History of Reux Samplers ...................................................... 6
3.2 Filter Section ..................................................................................... 6
3.3 Steam Supplement ........................................................................... 6
3.3 Inlet Temperature Section ................................................................ 6
3.4 Heat Exchanger Section ...............................................................6-7
3.5 Outlet Temperature Section ............................................................. 7
3.6 Self Acting Temperature Controller ..................................................7
3.7 Instrument Air for the Vortex Tube ................................................... 7
3.8 Vortex Theory of Operation .............................................................. 7
4. Utility Requirements ..................................................................................... 8
4.1 Instrument Air ................................................................................... 8
4.2 Low Pressure Steam ........................................................................ 8
5. Installation ..................................................................................................... 9
5.1 Mechanical Considerations .............................................................. 9
5.2 Fast Loop Line Size and Response Times ..................................... 9
5.3 Insulation ..........................................................................................9
6. Start-Up .......................................................................................................10
7. Operation .................................................................................................... 11
7.1 Vortex Tubes ................................................................................... 11
7.2 Steam Injection ............................................................................... 11
7.3 Controller ........................................................................................ 11
8. Maintenance ...............................................................................................12
8.1 Filter Section and/or Heat Exchanger Cleaning .......................12-13
9. Trouble Shooting ........................................................................................14
9.1 Vortex Tubes ...................................................................................14
10. Sub-Component Documentation ............................................................. 15
10.1 Vortex Tube Installation and Maintenance .............................15-17
10.2 Installation and Maintenance for SA Control Valve ...............18-24
11.2.1 General Safety ................................................................ 19
11.2.2 Tech. Details ...................................................................19
11.2.3 Install and Commiss ..................................................20-22
11.2.4 Maintenance ..............................................................23-24
10.3 Supplement Safety Information ................................................... 25
10.3.1 Intended Use ..................................................................25
The following safety symbols are used on
the product as well as in this manual.
DANGER
This symbol indicates that an operator
must follow the instructions laid out in
this manual in order to avoid the risks, for
the human body, of injury, electric shock
or fatalities. The manual describes what
special care the operator must take to
avoid such risks.
WARNING
This symbol indicates that an operator must
refer to the instructions in this manual in
order to prevent the instrument (hardware)
or software from being damaged, or a
system failure from occurring.
CAUTION
This symbol gives information essential
for understanding the operations and
functions.
Note!
This symbol indicates information that
complements the present topic.
PROCESS FLANGE
CLEAR APERTURE TOLERANCE
LATERAL OFFSET OF NOZZELS MUST BE MINIZED AS TO
ALLOW FOR MINMUM 1.75” [45MM] CLEAR APERTURE.
BEST INSTALLATION WILL HAVE NO LATEAL OFFSET.