User guide

<5. INSTALLATION AND WIRING>5-1 5-2
IM 11Y01B01-01E-A 6th Edition :Feb 13, 2013-00
5.2 Position of Process Flanges for Launch and Detect Units:
Process anges should be located on the process such that the Launch and Detect Units can be installed,
accessed and removed in a safe and convenient manner.
The following criteria/Check List should be met at a minimum:
• Good, Safe Engineering practices
• Local codes and regulations for such equipment installation
• Appropriate hazardous area (if applicable) precautions
• Owner Company best practice and engineering standards
• Access for personnel to stand in front of launch and Detect Units
• Clearance for installation and removal of Launch and Detect (see below)
• Clearance for installation and removal of purge insertion tubes (if applicable)
• Access to process isolation valves
• Safe routing for interconnecting cables
• Ambient conditions in accordance with analyzer limits
• Access to appropriate utilities
• Adjacent space for mounting to Calibration Cell when off-line
TDLS200 TDL Analyzer Instruction Manual V2.1
Page 40 of 131
- 04 -
3.2 Position of Process Flanges for Launch and Detect Units:
Process flanges should be located on the process such that the Launch and Detect Units can be
installed, accessed removed in a safe and convenient manner.
The following criteria/Check List should be met at a minimum:
Good, Safe Engineering practices
Local codes and regulations for such equipment installation
Appropriate hazardous area (if applicable) precautions
Owner Company best practice and engineering standards
Access for personnel to stand in front of launch and Detect Units
Clearance for installation and removal of Launch and Detect (see below)
Clearance for installation and removal of purge insertion tubes (if applicable)
Access to process isolation valves
Safe routing for interconnecting cables
Ambient conditions in accordance with analyzer limits
Access to appropriate utilities
Adjacent space for mounting to C
alibration Cell when off-line
Figure 22 - and Detect Unit – In-Situ Installation Overview
Figure 23 - Launch and Detect Unit – In-Situ with Insertion Purge Tube Installation Overview
Figure 23 - Launch and Detect Unit-In -Situ Installation Overview
Figure 24 - Launch and Detect Unit-In-Situ with Insertion Purge Tube Installation Overview