3.4 Process Flange Clear Aperture
The Launch and Detect unit anges (and insertion tubes if used) should be installed in such a way that a
minimum clear through aperture (opening) diameter of 1 ½” (38 mm) when the distance between the 2” 150#
ange faces does not exceed 6ft (~2 m).
Note: Larger clear through apertures may be required when operating over longer distances –
CONSULT FACTORY for further details.
3.5 Mounting the Launch and Detect Units to the Process Flange
Securely bolt the Launch and Detect Units to the process anges using the standard bolt holes provided. Ensure
the correct size bolts, nuts, and gasket are used in accordance with the ange speci cations and in accordance
with the process speci cations when applicable.
NOTE: If the process isolation valve ange is excessively hot due to the process temperature or radiant
heat, then a thermal insolating ange gasket should be used in order to minimize the heat transfer to the
analyzer ange face.
It is generally bene cial to make the ange of the Launch and Detect Units and the ange of the process
concentric with each other. Due to the large clearance provided by standard anges and bolts, it is possible to
mount the two anges in an un-concentric manner – this should be avoided to aid laser beam alignment.
Figure 6 - Clear Aperture for Launch or Detect Unit Flanges
PROCESS FLANGE
CLEAR APERTURE TOLERANCE
LATERAL OFFSET OF NOZZELS MUST BE MINIZED AS TO
ALLOW FOR MINMUM 1.75” [45MM] CLEAR APERTURE.
BEST INSTALLATION WILL HAVE NO LATEAL OFFSET.
3-5<3 INSTALLATION AND WIRING>
IM 11Y01B02-11E-A 5th Edition :June 5, 2012-00