  Users at Level C or higher can cancel the calibration/validation command until the 
measurement of the currently-measured stream is completed.
  When calibration (or validation) is completed for all the streams specifi ed for the selected 
calibration (or validation) number, measurement is resumed from the next stream in the run 
mode in the stream sequence status.
Run
W7 W7 W8
W3
S2 S3S8
W1 W2
S1 S7S7
Time
Stream sequence 1 Calibration 1 Stream sequence 1
Assinning calibration 1
  In the case where a (semiautomatic) calibration/validation command is received during the 
stop mode in the stream sequence status
  Calibration (or validation) is immediately started.
  When calibration (or validation) is completed for all the streams specifi ed for the selected 
calibration (or validation) number, the operation mode returns to the stop mode in the 
stream sequence status.
Stop StopRun
W7 W7 W8
S8S7S7
Time
Stream sequence 1 Calibration 1 Stream sequence 1
Assinning calibration 1
  In the case where a (semiautomatic) calibration/validation command is received during the 
pause mode in the stream sequence status
  Calibration (or validation) is immediately started.
  When calibration (or validation) is completed for all the streams specifi ed for the selected 
calibration (or validation) number, the operation mode changes to the stop mode in the 
stream sequence status.
Pause Stop StopRun
W7 W7 W8
S8S7S7
Time
Stream sequence 1 Calibration 1
(Replaceable) (Replaceable)
Stream sequence 1
Assinning calibration 1 Calibration (or validation) start command Calibration (or validation) stop command
  In the case where a (semiautomatic) calibration/validation command is received during the 
run mode in the stream specifi cation status (for continuous measurement)
  Calibration (or validation) is started when the measurement of the currently-measured 
stream is completed.
  Users at Level C or higher can cancel the calibration/validation command until the 
measurement of the currently-measured stream is completed.
  When calibration (or validation) is completed for all the streams specifi ed for the selected 
calibration (or validation) number, the operation mode returns to the run mode in the stream 
specifi cation status (for continuous measurement).
2nd Edition : May 11, 2012-00