Instruction Manual

<1. Overview>
1-62
IM 11B08A01-01E
When calibration (or validation) is completed for all the streams speci ed for the selected
calibration (or validation) number, the measurement status returns to the status before the
calibration (or validation). The operation mode after calibration (or validation) is determined
as follows depending on the measurement status and the operation mode before the
calibration (or validation).
Measurement status and operation mode before calibration (or
validation)
Operation mode after
calibration (or validation)
Stream sequence/Stream speci cation (for continuous measurement), Run Run
Stream speci cation (for N times of measurement), Run Stop
Stream sequence/Stream speci cation (for continuous measurement)/
Stream speci cation (for N times of measurement), Stop
Stop
Stream sequence/Stream speci cation (for continuous measurement)/
Stream speci cation (for N times of measurement), Pause
Stop
Users at Level B or higher are allowed to stop calibration (or validation).
F0128.ai
Figure 1.28 An example of the calibration (validation) method window on the GCM operation status
screen on the GC-HMI analyzer operation display
2nd Edition : May 11, 2012-00