Instruction Manual
  <1. Overview>
1-62
IM 11B08A01-01E
•  When calibration (or validation) is completed for all the streams specifi ed for the selected 
calibration (or validation) number, the measurement status returns to the status before the 
calibration (or validation). The operation mode after calibration (or validation) is determined 
as follows depending on the measurement status and the operation mode before the 
calibration (or validation).
Measurement status and operation mode before calibration (or 
validation)
Operation mode after 
calibration (or validation)
Stream sequence/Stream specifi cation (for continuous measurement), Run Run
Stream specifi cation (for N times of measurement), Run Stop
Stream sequence/Stream specifi cation (for continuous measurement)/
Stream specifi cation (for N times of measurement), Stop
Stop
Stream sequence/Stream specifi cation (for continuous measurement)/
Stream specifi cation (for N times of measurement), Pause
Stop
  Users at Level B or higher are allowed to stop calibration (or validation).
F0128.ai
Figure 1.28  An example of the calibration (validation) method window on the GCM operation status 
screen on the GC-HMI analyzer operation display
2nd Edition : May 11, 2012-00










