Instruction Manual
  <1. Overview>
1-43
IM 11B08A01-01E
Run
W4W1 W2
S2S1 S4
W4
S4
[1C2]
Time
Stream sequence 1 Stream specification 4 (Twice)
Assinning stream specification 4 (Twice)
Stop
  In the case where a stream specifi cation change command is received during the pause 
mode in the stream sequence status [1B6]The measurement status is immediately changed 
to the requested stream specifi cation status.
  In this case, the operation mode changes to the stop mode and valves are all closed (turned 
off).
Run
[1B6]
Time
Stream sequence 1 Stream specification 4
Assinning stream specification 4
Stop
  In the case where a stream specifi cation change command is received during the stop 
mode in the stream sequence status [1B1]
  The measurement status is immediately changed to the requested stream specifi cation 
status.
  In this case, the operation mode remains unchanged from the stop mode.
[1B1]
Time
Stream sequence 1 Stream specification 4
Assinning stream specification 4
Stop
  In the case where a stop command is received during the run mode in the stream sequence 
status [1E2]
  The operation mode is immediately prepared to be changed to the stop mode.
  The operation mode changes to the stop mode in the stream sequence status when the 
measurement of the currently-measured stream is completed.
  The stop command can be canceled with a cancel command until the operation mode 
changes to the stop mode.
Run
W3W1 W2
S2S1
[1E2]
Time
Stream sequence 1
Stop command
Stop
2nd Edition : May 11, 2012-00
1










