Instruction Manual
  <1. Overview>
1-42
IM 11B08A01-01E
  In the case where a stream sequence change command is received during the run mode in 
the stream sequence status [1A2]
  The measurement status is changed to the requested stream sequence status when the 
measurement of the currently-measured stream is completed.
  In this case, the operation mode remains unchanged from the run mode.
  * Requests for changes to the same stream sequence number are invalid.
  In the case where a stream sequence change command is received during the pause mode 
in the stream sequence status [1A6]
  The measurement status is immediately changed to the requested stream sequence status.
  In this case, the operation mode changes to the stop mode and valves are all closed (turned 
off).
  * Requests for changes to the same stream sequence number are invalid.
Stop Run
W4 W5 W1 W2 W3
S2S1S5S4
[1A1]
[1A2]
Time
Stream sequence 1 Stream sequence 2 Stream sequence 1
Assinning stream 
sequence 2
Assinning stream sequence 1
Run command
StopPause Run
W4 W5 W1 W2 W3
S2S1S5S4
[1A6]
[1A2]
Time
Stream sequence 1 Stream sequence 2 Stream sequence 1
Assinning stream 
sequence 2
Assinning stream sequence 1
Run command
  In the case where a stream specifi cation change command (for continuous measurement) 
is received during the run mode in the stream sequence status [1B2]
  The measurement status is changed to the requested stream specifi cation status (for 
continuous measurement) when the measurement of the currently-measured stream is 
completed.
  In this case, the operation mode remains unchanged from the run mode.
Run
W4W1 W2
S2S1 S4
W4
S4
W4
S4
W4
S4
W4
[1B2]
Time
Stream sequence 1 Stream specification 4 (Continuous)
Assinning stream specification 4 (Continous)
  In the case where a stream specifi cation change command (for N times of measurement) is 
received during the run mode in the stream sequence status [1C2]
  The measurement status is changed to the requested stream specifi cation status (for 
N times of measurement) when the measurement of the currently-measured stream is 
completed.
  In this case, the operation mode changes from the run mode to the stop mode when the Nth 
round of the specifi ed measurement is completed.
2nd Edition : May 11, 2012-00










