Instruction Manual

<1. Overview>
1-39
IM 11B08A01-01E
Run Pause Stop Run Pause Stop
Run Stop
Stream sequence
Stream designation
Calibration/validation
*1
*1*1*1*1
*2
*1
(1) (2) (1) (2)
*1
(3) (4)
(A) (A) (A)(A)(B) (B) (B)(B)
*1: Command can be canceled.
*2: Only for manual
If a calibration/validation command is issued during the pause mode or the stop mode in the stream sequence or stream speci ation
(N times or continuous (set to “0”)) status
(A) The measurement status and the operation mode innediately changes to the requested calibration/validation status and the
run mode, respectively.
(B) The measurement status and the operation mode respectivily return to the stream sequenace status and the stop mode
when calibration/validation is complete for all the spwci ed streams.
If a calibration/validation command is issued during the run mode in the stream sequence status
(1) The measurement status changes to the requested calibration/validation status when the measurement of the currently-
measured stream is completed.
(2) The measurement status and the operation mode respectively return to the stream sequence status and the run mode when
calibration/validation is completed for all the speci ed streams. The suspended measurement is (not reset but) resumed from
the next stream.
If a calibration/validation commands is issued during the run mode in the stream speci cation (N times) status
(3) The measurement status changes to the requested calibration/validation status when the Nth round of the spwci ed
measurement is completes.
(4) The measurement status and the operation mode respectively return to the stream speci cation (N times) status and the stop
mode when calibration/validation is completed for all the speci ed streams.
If a calibration/validation command is issued in the stream speci cation (Continuous (set to “0”))status
(3) The measurement status changes to the requested calibration/validation status when the measurement of the currently-
measured stream is completed.
(4) The measurement status and the operation mode respectively return to the stream speci cation (Continuous) status and the
run mode when calibration/validation is completed for all the speci ed streams.
Figure 1.19 Transition among measurement statuses and operation modes
(1) Operation description
For example, this section describes the operation where the stream sequence, calibration, and
validation are set as shown in Table 1.5, 1.6, and 1.7, respectively.
Table 1.5
1st stream 2nd stream 3rd stream
Stream sequence 1 Stream 1 Stream 2 Stream 3
Stream sequence 2 Stream 4 Stream 5 Stream 6
Table 1.6
Calibration
stream
Measurement
frequency
Automatic
calibration
Validation
stream
number
before
calibration
Measurement
frequency
Validating
stream
number
after
calibration
Measurement
frequency
Calibration 1 Stream 7 2 Valid 0 0 Stream 8 1
2nd Edition : May 11, 2012-00
1