Instruction Manual
    <6. Maintenance>
6-58
IM 11B08A01-01E
F0250.ai
In case of K9193NT, NYIn case of K9193NU, NX
(2)
(2)
(1)
Air
Air
SV11
EXH
IN
IN
IN
OUT
SV11
EXH
IN
OUT
OUT2
OUT2
OUT1
OUT1
PV12
PV11
PV11
Figure 6.50 
(6) Diaphragm of Pneumatic Valve for Atmospheric Pressure Balancing or 
Stream Switching
(1)  Remove the pipe for air.
(2)  Remove the four screws on the upper section of the stream switching valve (see Figure 
6.51) or the atmospheric-pressure balancing valve (see Figure 6.52) to remove the upper 
section of the valve itself.
(3)  Replace the diaphragm with a new one and reassemble the valve. Install the new 
diaphragm in the same orientation. Exercise care to avoid losing the adjusting pin and 
spring at the lower section of the valve.
F0251.ai
1
10
 No.  Part name  Part number  Quantity
air in
4
2
3
11
7
5
6
9
8
K9192WB
K9192WA
 1  BASE  K9192WD  1  1
 2  BODY  K9192WE  1  1
 3  CAP  K9192WF  1  1
 4  PISTON  K9192WG  1  1
 5  O-RING  K9142QU  1  1
 6  O-RING  L9817FK  1  1
 7  SPRING  K9192WH  1  1
 8  SPRING  K9035AW  1  1
 9  PIN  K9192WK  1  1
10
DIAPHRAGM
 K9192WL  1 
     K9192WV    1
 11  SCREW  Y9335JU  4  4
Figure 6.51  Stream Switching Valve
2nd Edition : May 11, 2012-00










