Instruction Manual
  <5. EtherLCD>
5-72
IM 11B08A01-01E
4.  Copy rules for synchronized peaks.
Destination
Source
Independent peak  Parent peak  Child peak 
Independent peak  Copy as is (change copy 
item)
Maintain destination peak 
in independent peak and 
synchronize (comply with 
synchronization rules to 
change synchronization 
items).
Assess using peak 
synchronizing rules. When 
synchronization is not possible, 
maintain independent peak 
and synchronize. When 
synchronization is possible, 
set synchronization as 
synchronization target of copy 
destination = synchronization 
target of copy source.
Parent peak  Cannot copy Cannot copy Cannot copy
Child peak  Convert to independent 
peak and copy (change 
copy item).
Convert to independent 
peak and synchronize 
(comply with 
synchronization rules to 
change synchronization 
items).
Assess using peak 
synchronizing rules. When 
synchronization is not possible, 
maintain independent peak 
and synchronize. When 
synchronization is possible, 
set synchronization as 
synchronization target of copy 
destination = synchronization 
target of copy source.
5.  Copy items: Copy stream number in peak process-specifi c setup part (T19) and parts other 
than relative peak number 
 Peak copy 2 
Press F3 (Copy 2).
11/11/22
15:15:45
Peak Copy 2  (1/2)
Stream # 1  Use num # 1  Assign # 10
Peak#  Name  Usage  Process (Detail)
 1  P1  On  Base level
 2  Off Indirect
 3  Off Indirect
 4  Off Indirect
 5  Off Indirect
 6  Off Indirect
 7  Off Indirect
 8  Off Indirect
Menu
PeakSet
Copy
F1 F2 F3 F4 F5 F6
Figure 5.80 
Example of peak copy 2 screen
F1 (Menu):  Displays the Table Menu screen.
F2 (PeakSet):  Displays the Peak Setup-Specifi c screen
F6 (Copy):  Executes copy after entering Source peak and Destination peak.
•  Stream number for display and setting becomes the stream number in the peak setup-
specifi c screen when relevant screen is requested.
•  Copy destination peak must be an independent peak. 
•  See Peak synchronization and peak copy items regarding data for copy.
•  When Process (Type) is set to No processing, Process (Detail) displays No processing.
2nd Edition : May 11, 2012-00