Instruction Manual
<5. EtherLCD>
5-60
IM 11B08A01-01E
Display Item Name Set Lower Limit Upper Limit Unit Remarks
GCM # GCM number 1 6
SYS # SYS number 1 6
Method # Method number 1 6
ATM valve ATM valve number 0 3 2 0: None
1 to 3 Oven
1 to 2 ATM valve
1st to 3rd ON
time
Warming
up time
Analysis
cycle 2
seconds ATM valve time setup
Some entry data are invalid.
1st to 3rd
OFF time
seconds
D/O Action Setting Screen
Press F5 (DO).
11/11/22
15:15:45
D/O Action Setting
GCM #1 / SYS #1 / Method #1
> - 1st DO ON time * * * * * * * s
- 1st DO OFF time * * * * * * * s
- 2nd DO ON time * * * * * * * s
- 2nd DO OFF time * * * * * * * s
- 3rd DO ON time * * * * * * * s
- 2nd DO OFF time * * * * * * * s
Seq Gate Valve AtmV
F1 F2 F3 F4 F5 F6
Figure 5.74
Example of the D/O action setting screen
F1(Seq): Displays SYS Sequential Display screen.
F2(Gate): Displays Gate of the action set screen.
F3(Valve): Displays ON/OFF time screen of a valve (1st, 2nd & 3rd of the maximum No. 1
to No. 18).
F4(Atm): Displays ON/OFF time screen of ATM valve (1st, 2nd & 3rd).
Display Item Name Set Lower Limit Upper Limit Unit Remarks
GCM # GCM number 1 6
SYS # SYS number 1 6
Method # Method number 1 6
1st to 3rd ON
Time
0 Analysis
cycle 2
seconds D/O time setup
Some entry data are invalid.
* When ON time is invalid, the
minimum OFF time is 0.
1st to 3rd
OFF Time
ON time Analysis
cycle 2
seconds
2nd Edition : May 11, 2012-00