Instruction Manual
    <3. Basic Operation and Startup>
3-8
IM 11B08A01-01E
(3) When   is pressed, the set pressure, present pressure, and EPC ON/OFF status of the 
Carrier n-n-1 to n-4 and Utility n-1 to n-4 are indicated.
Figure 3.9
 NOTE
Measure the pressure and fl ow rate of each gas after the temperatures of the isothermal oven 
have fully stabilized. If the temperature is low, the pressure is likely to be higher. The time 
required for the temperature to stabilize depends on the set temperature: the isothermal oven 
with the temperature of below 146°C requires 2 to 4 hours, and the one with the temperature 
of at or above 146°C requires 4 to 8 hours. For the FID or FPD detector, the “Therm signal” 
on the Detector Status screen becomes 0 mV after the temperature of the isothermal oven 
has stabilized (see Figure 3.8). See Section 3.1.4, “How to Check the Operating Status of the 
Detector”.
For the FID and FPD, a carrier gas, combustion gas, and combustion air are discharged together 
from the DET vent. Therefore, before measurement close the primary valves of cylinders of 
gases that are not to be measured. For the FID and FPD, supplying the gas may simply result 
in natural ignition. In the Flame on status, condensation forms on the vent line and the “Therm 
signal” on the Detector Status screen indicates 2 to 6 mV. Measure the gas fl ow rate under the 
condition that the “Therm signal” is 0 mV.
2nd Edition : May 11, 2012-00










