EPC program Set (1/2)
GCM #1 / SYS #1 / Method #1 / Gas #1-#1
> - Initial press setpoint 100.0 kPa
-
#1 Press ramp start time
30.0 s
Total run-time 400.0 s
Main Menu Menu Menu Oven# Gas#
F1 F2 F3 F4 F5 F6
11/03/22
15:15:45
EPC program Set (2/2)
GCM #1 / SYS #1 / Method #1 / Gas #1-#1
> - #1 Press ramp rate 50.0 kPa/min
-
#1 Press hold setpoint
200.0 kPa
- #1 Press hold time 30.0 s
- #2 Press ramp rate 100.0 kPa/min
-
#2 Press hold setpoint
300.0 kPa
- #2 Press hold time 30.0 s
- #3 Press ramp rate 200.0 kPa/min
-
#3 Press hold setpoint
400.0 kPa
- #3 Press hold time 100.0 s
Main Menu Menu Menu Oven# Gas#
F1 F2 F3 F4 F5 F6
Figure 1.41
Setting example of SYS method EPC program (GC-HMI EtherLCD)
11/03/22
15:15:45
Operating Parameters (1/8)
Oven #? Carrier gas #2
- Carrier gas type H2
- Carrier gas pressure 140.0 kPa
Menu Menu Menu Menu Oven# Gas#
F1 F2 F3 F4 F5 F6
Figure 1.42
Operation conditions setting (GC-HMI EtherLCD)
(3) Auto-operation starting function
Auto-operation starting function operates the analyzer at process status Run mode without
manual operation. When the auto-operation is started, consecutive measurement of the streams,
which were set to the stream sequence 1, is performed in order.
It is required to supply power, protection gas, carrier gas, and utility gas sample to the analyzer in
the same manner as when starting up the device manually.