IM 11B03A03-01E 3rd Edition : Aug. 23. 2006-00
2. Operation Data
Operation data is supplied with the operation manuals in the delivered package and con-
tains the following required to use the gas chromatographs.
● Process conditions and measurement range
● Instrument specifications and operating conditions
● Standard sample for calibration
● Column system and column
● Miscellaneous data
Chromatogram, base line, repeatability, power supply voltage variation, etc.
● Analyzer flow diagram and installation
● Parts composition table
● General connection diagram
● Sampling system diagram (only if supplied by Yokogawa)
● Is the System Ready?
Before reading this manual, the following preparations must have been completed.
● The system must be unpacked and installed in the correct place.
● The piping for the utility gases such as carrier and calibration gases must be com-
pleted, followed by leak checking.
● The wiring for the power supply and others must be completed.
If these have not been completed yet, see the Installation Manual (TI 11B03A03-13E).
After completion, return to this manual and do the following:
● If the system power is on, turn off the power.
● Shut off all the gases at the flow control units.
Please read the following respective cautions (General Precautions, Caution of
using Explosion-Protection Instruments, on Piping Construction, and on Piping
Work) before installing and using the GC1000 system.