Owner manual

<Toc> <Ind> <4. Outline of Software >
4-13
IM 11B03A03-01E
4.4.3 Actions of Stream (1 cycle)
Stream (1 cycle) 1 to 31 is allowed to be specified only when the measurement status is in
Stream Sequence 1 to 4. The same action is performed when the Stream (1 cycle) is
specified at any timing during analysis.
(1) When Stream (1 cycle) 1 to 31 is specified while the measurement status is in Stream
Sequence 1 to 4 and the operation mode is in Stop or in Pause, the specified stream
is measured once and then the measurement status turns to Stream Sequence 1 and
the operation mode returns to Stop.
(2) An action when Stream (1 cycle) 4 is specified while the measurement status is in
Stream Sequence 1 and the operation mode is in Run, is shown in Figure 4.12.
W3 W1 W2 W3W2
S1 S2 S3
W4
S4 S1 S2
Select the Stream (1 cycle) 4
Time
Stream Sequence 1 Stream Sequence 1Stream (1 cycle) 4
S1 to S4: Analysis cycles for streams 1 to 4
W1 to W4: Warming up time for streams 1 to 4
F0412.EPS
Figure 4.12 Action of Stream (1 cycle)
3rd Edition : Aug. 23. 2006-00