4.4.2 Actions of Stream (Continuous)
Actions are different according to the timing when Stream (continuous) is specified.
(1) An action when the operation mode is transferred from Stop to Run while the mea-
surement status is in Stream (continuous) 2 and the operation mode is in Stop, is
shown in Figure 4.8.
W2 W2 W2 W2 W2 W2W2
S2 S2 S2 S2 S2 S2
Run command
Time
Stream (Cont) 2
S2: Analysis cycles for stream 2
W2: Warming up time for stream 2
F0408.EPS
Figure 4.8 Action of Stream (Continuous) (1)
(2) An action when Stream (continuous) 3 is specified before the following warming up
time starts while the measurement status is in Stream (continuous) 2 and the opera-
tion mode is in Run (i.e., Stream 2 is being measured), is shown in Figure 4.9.
W2 W3 W3 W3 W3 W3W2
S2S2 S2 S3 S3 S3 S3
Select the Stream (cont) 3
Time
Stram (Cont) 2
Stream (Cont) 3
S2, S3: Analysis cycles for streams 2 and 3
W2, W3: Warming up time for streams 2 and 3
F0409.EPS
Figure 4.9 Action of Stream (Continuous) (2)
(3) An action when Stream (continuous) 3 is specified after the following warming up time
has started while the measurement status is in Stream (continuous) 2 and the opera-
tion mode is in Run (i.e., Stream 2 is being measured), is shown in Figure 4.10.
W2 W2 W3 W3 W3 W3W2
S2S2 S2 S2 S3 S3 S3
Select the Stream (cont) 3
Time
Stram (Cont) 2
Stram (Cont) 3
S2, S3: Analysis cycles for streams 2 and 3
W2, W3: Warming up time for streams 2 and 3
F0410.EPS
Figure 4.10 Action of Stream (Continuous) (3)