Operation Manual

<Appendix B. Device Information>
B-2
IM 01C25R51-01E
B-2 How to Congure digitalYEWFLO AR Block
This section explains how to set the function block scheduling and connection information with
the following device as an example.
I
nthisexample,NI-FBUSCongurator3.1isusedasasettingtool.
Table B2.1 Object device (Case 1: AR Block is standalone)
Value Device
Function
Block
Input to
AR Block
Output from
AR Block
Factory setting
of scheduling
information
(1) Mass Flow Rate digitalYEWFLO AR Block
T
able B2.2 Object device (Case 2: AR Block is connected with other devices)
Value Device
Function
Block
Input to
AR Block
Output from
AR Block
Factory setting
of scheduling
information
(1)
V
olumetricFlowRate
(Qv)
digitalYEWFLO AI3 Block
(2) Temperature
Temperature Transmitter
(Yokogawa YTA320)
AI1 Block
(3) Pressure
Pressure Transmitter
(Yokogawa EJX510A)
AI1 Block
(4) Mass Flow Rate digitalYEWFLO AR Block
Step 1 Conrm the installation status of the device DD.
TosetthedevicebyusingNI-FBUSCongurator,thedeviceDDmustbesuccessfullyinstalledin
the following folder.
<WinInstDrive>:\ProgramFiles\NationalInstruments\NI-FBUS\Data\594543”
(<WinInstDrive>: Windows installed drive)
(
Thefoldername“594543”indicatesthatthemanufacturerisYokogawaElectricCorporation.)
TheDDlesaresavedforeachmodelinthefolder.ConrmthatthelatestDDles(FileName:
AABB.ffo, AABB.sym*) are installed for each device.
(
*:AA=“DeviceRevision”,BB=“DDRevision”,Forexample:0301.ffoand0301.sym)
• digitalYEWFLO:Foldername“0009”
• YTA320:Foldername“0005”
• EJX510A:Foldername“000C