Operation Manual
    <Appendix B.  Device Information>
B-1
IM 01C25R51-01E
Appendix B. Device Information
B-1  Start up Procedure of Device and 
FlowNavigator
(1) digitalYEWFLOandDYFMVTool
Theowchartbelowshowsthestart-upprocedureofdigitalYEWFLOandDYFMVTool.
Set digitalYEWFLO F
OUNDATIONeldbusaccordingtothechartandthenproceedto
"DYFMVTool-FlowConguration-"and"DYFMVTool-ConrmFlowConguration-".
digitalYEWFLO -Initial Setting- 
- Connect the Device to the Power Supply
- Connect the Device to the Segment
START
digitalYEWFLO -Confirm FOUNDATION fieldbus Setting- 
- Address setting
- Tags (PD Tag and VFD Tag) setting
DYFMVTool -Flow Configuration- 
- Upload and edit Device General Parameters 
 using DYF (SoftDL) F
OUNDATION fieldbus DTM
- Configure Device Flow Parameters 
 using Flow Configuration Wizard
- Download Device Parameters 
 using DYF (SoftDL) F
OUNDATION fieldbus DTM
digitalYEWFLO -Configure AR Block- 
- Scheduling digitalYEWFLO AR Block and 
 connected other devices AI Block
- Wiring digitalYEWFLO AR Block
END
FB0101E.ai
DYFMVTool -Confirm Flow Configuration-
 Case1: AR Block is standalone
- Set input conditions in AR Block
 (digitalYEWFLO starts flow calculation)
- Confirm output in AR Block
Case2: AR Block is connected with other devices
- Set input conditions in Connected Device's AI Block
 (digitalYEWFLO starts flow calculation)
- Confirm input conditions in AR Block
- Confirm output in AR Block
 Refer to Section 8.3
 Refer to Section 8.3
 Refer to Chapter 6
 Refer to Section 4.5
 Refer to Section 4.5
Figure B1.1  Start up Procedure of digitalYEWFLO and DYFMVTool










