Owner's manual

IM 11Y01B02-01E-A 4th Edition September 11, 2012-00
<1 QUICK START> 1-1
Step Title Description
1.0
Preparation
Carefully un-pack and check equipment for any obvious damage.
1.1 Ensure the appropriate utilities are available and ready for connection. These may include electri-
cal power, nitrogen purge gas, instrument air, validation gas, etc. Make sure the sample handling and
conditioningsystemmeetsthesampleinletandoutletrequirementsforTDLS220.RefertoSectionXX
“Installation” for details.
1.2 Ensureyoucomplywithanylocaland/orsitespecicsafetyrequirements.
1.3
ReadtheappropriatesectionsoftheInstructionManualBEFOREstartinganyinstallationwork–Contact
Yokogawa Laser Analysis Division or Local Agent if any doubts!
2.0
Installation
Ensurethereissufcientphysicalspacetomounttheanalyzerandallowsuitablespaceforanyfuture
maintenanceaccess.Mounttheanalyzer/paneltoasecureverticalsurfaceusingappropriatestyle
shake-prooffasteners.Avoidareaspronetovibrationtoensurelongtermreliability–theanalyticalmea-
surement itself is not affected by vibration.
3.0
Wiring
Ensure that all wiring will meet local codes and site requirements
3.1 ConnectprotectivegroundwiretotheprotectivegroundterminalofTDLS220.Useminimum14AWG
wire or equivalent.
3.2 Connect the appropriate single phase AC electrical power supply.
•110/24050/60Hztotheterminalblocklocatedinthepower/TemperatureControllerbox.
RefertoPart2(ElectricalHazard)ofthe“Safety”sectioninthismanual.Asuitablemains
disconnectdevicemustbesupplied.Refertothe“Installation”sectionofthismanualfor
details.
3.3 Check termination details before proceeding to prevent damage to electronics.
ConnectanyanalogI/OsignalstotheoptionalanalogI/OBoard.OutputslandonTB8andanypressure
inputslandonTB9.
HeatedowcellshavethegastemperaturesignalalreadyterminatedatTB9.
A table of wiring terminations is included in this Instruction Manual
3.4 ConnectanyotherequipmentsuchasEthernet,solenoidvalves,digitalI/O,etc.Note.Solenoidsrequire
directionaldiodeorferritecoiloneldwiresatterminalblocktopreventnoisespikes.
3.5 Check terminations and ensure all cable shields are landed per supplied wiring details.
4.0
Utilities and
Sample
NOTE! – All purge, Validation Gas and other gas utility lines should be thoroughly cleaned, dried
and purged prior to connecting to the analyzer – Failure to do so can result in serious damage to
the TDLS220 or contamination to the internal optical elements resulting in poor performance
Connecttheappropriateanalyzerpurgegas(nitrogenforoxygenanalyzers)andmakesiteconnections
perthesuppliedpurgegassequencedetails(includinganyHazardousareapurgesystem).Startthe
purgegasowaccordingly.
SomeOxygenanalyzersmaybecapableofoperatingwithInstrumentAirpurgealoneorinconjunction
withNitrogenpurgeofthemeasurementenclosure.
4.1 Connectprocessgassampletotheinletportandtheprocesssamplereturn/venttotheowcelloutlet
port.
Ensureallinletlinesarecleananddrybeforeconnectingtopreventcontaminationoftheowcelland
owcellwindow/mirror.
1 Quick Start