Manual

<2. About the EJX Multivariable Transmitter>
2-1
IM 01C25R01-01E
2. About the EJX Multivariable
Transmitter
This chapter gives an overview of the functions and
the installation of the EJX Multivariable transmitter.
For details on specic procedures, refer to the
corresponding chapter.
2.1 Features
Multi Sensing Function
The EJX multivariable transmitter has a Multi
Sensing function that enables a single transmitter
to measure differential pressure, static pressure,
and external temperature. Mass ow measurement
instruments can calculate and output the ow
value using these three measured variables except
Modbus Communication Type. The FSA120 ow
conguration software (FlowNavigator) is used to
congure mass ow calculation.
Simultaneous Analog Output and Pulse
Output (HART protocol type)
The EJX multivariable transmitter has one analog
output for the output of single measured variables.
With digital communications, all of these variables
can be output simultaneously.
In addition to analog output, pulse output is
provided as a standard function of the EJX
multivariable transmitter. It can perform both types
of output simultaneously. Pulse output is used for
total ow, ow rate, and alarm status.
DP sensor
SP sensor
Sensor Capsule
A/D
ROM
PC: Flow configuration
Electronics module
RTD Temperature InputPressure Input
4 to 20 mA output
for selected PV.
RAM
Differential Pressure
/Static Pressure
/Process Temperature
/Calculated Mass Flow
ROM
MPU
/Calculate Mass Flow
/System control
D/A
Digital I/O
Pulse
output
Pulse output
or Status output.
Silicon Resonant
sensor
F0201.ai
Figure 2.1 Block Diagram of EJX Multivariable Transmitter System (HART protocol type)
2.2 Initial Check and Installation
Procedure
Figure 2.2 is a owchart showing the basic
sequence for installing and wiring an EJX
Multivariable Transmitter.
Refer to the specied chapter for the details of each
procedure.
Flow conguration can be performed at the
following stages:
(1) On the bench, before installation.
(2) In the eld, after installation.
IMPORTANT
Before performing ow conguration in the eld,
make sure the installation location meets all
safety requirements.