Manual
    <5.  Installation>
5-3
IM 01C25R01-01E
5.4  Swapping the High/Low-
pressure Side Connection
5.4.1  Rotating Pressure-detector Section 
180° 
This procedure can be applied only to a transmitter 
with a vertical impulse piping type.
The procedure below can be used to turn the 
pressure detector assembly 180°. Perform 
this operation in a maintenance shop with the 
necessary tools laid out and ready for use, and then 
install the transmitter in the eld after making the 
change.
1)  Use an Allen wrench (JIS B4648, nominal 2.5 
mm) to remove the two setscrews at the joint 
between the pressure-detector section and 
transmitter section.
2)  Leaving the transmitter section in position, 
rotate the pressure-detector section 180°.
3)  Tighten the two setscrews to x the pressure-
detector section and transmitter section 
together (at a torque of 1.5 N·m).
  Reposition the process connector and drain 
(vent) plugs to the opposite side as described in 
subsection 4.3.
F0505.ai
Process connector
Setscrew
Before After rotating 180°
Figure 5.5  Before and After Modication
5.4.2  Using the Communicator
With a communicator, you can change which 
process connection is used as the high-pressure 
side without mechanically rotating the pressure-
detector section 180 as described in subsection 
5.4.1. To change, call parameter ‘H/L swap’ for 
HART Communication and select REVERSE (right 
side: low pressure; left side: high pressure) or select 
NORMAL to change back to normal (right side: 
high pressure; left side: low pressure).  For other 
communication type except HART Communication 
Type, refer to each communication manuals.
Output
Input
NORMAL
REVERSE
F0506.ai
Figure 5.6  Input/Output Relationship 
IMPORTANT
Since the H/L label plate on the capsule 
assembly will remain unchanged, use this 
function only when you cannot switch the 
impulse piping. If the ‘H/L SWAP’ parameter 
setting is changed, the input/output relationship 
is reversed as shown in gure 5.6; be sure this is 
understood by all. 










