Instruction Manual
    <8.  Maintenance>
8-3
IM 01C27H01-01EN
CAUTION
Always remove Battery pack and shut off 
pressures before disassembly and assembly. 
Use proper tools for all operations.
8.4.1  Replacing the Integral Indicator
This subsection describes the procedure for 
replacing an integral indicator. (See gure 8.2)
■  Removing the Integral Indicator
1)  Remove the cover.
2)  While supporting the integral indicator with one 
hand, loosen its two mounting screws.
3)  Dismount the integral indicator from the RF 
assembly.
  When doing this, carefully pull the integral 
indicator straight forward so as not to damage 
the connector pins between it and the RF 
assembly.
■  Attaching the Integral Indicator
1)  Align both the integral indicator and RF 
assembly connectors and engage them.
2)  Insert and tighten the two mounting screws.
3)  Replace the cover.
Zero
adjustment
screw
RF assembly
CPU assembly
Amplifier cover
Mounting screw
Integral 
indicator
Boss
Stud
F0802.ai
Press
Forward
Power 
cable
Zero-adjustment
screw pin
Figure 8.2  Removing and Attaching Integral 
indicator, RF assembly and CPU 
Assembly
8.4  Disassembly and 
Reassembly
CAUTION
Precautions for the intrinsic safety explosion 
prevention type instrument
Intrinsic safe type transmitters must be, as 
a rule, removed to a non-hazardous area 
for maintenance and be disassembled and 
reassembled to the original state. Check and 
conrm the insulation when it is reassembled to 
the original state.
Check and conrm the insulation when it is 
reassembled to the original state.
Refer to section 2.7 “Insulation Resistance and 
Dielectric Strength Test” for details of Resistance 
Test.
IMPORTANT
•  Perform the provisioning when replacing the 
RF assembly. Refer to 6.4 Connecting to the 
Field Wireless Network for details.
•  Replace the batteries and perform the 
parameter settings when replacing the CPU 
assembly. Refer to 8.4.5 Replacing the 
Batteries.
This section describes procedures for disassembly 
and reassembly for maintenance and component 
replacement.
Table 8.2 shows the tools required.
Table 8.2   Tools for Disassembly and Reassembly
Tool Quantity Remarks
Phillips 
screwdriver
1 JIS B4633, No. 2
Slotted 
screwdriver
1
Allen wrenches 3 JIS B4648 
One each, nominal 3, 
4 and 2.5 mm Allen 
wrenches
Wrench 1 Width across ats, 17 mm
Torque wrench 1
Adjustable 
wrench
1
Socket wrench 1 Width across ats, 16 mm
Socket driver 1 Width across ats, 5.5 mm
Tweezers 1










