Operation Manual

iii
IM 01F06A00-01EN
Edition Data Page Revised Item
12th Mar. 2010 1-1
2-5
2-7
3-2
3-3
3-4
4-9
4-13 to 21
5-4
5-8
5-12
5-15
6-1
6-3
9-2
9-5 to 9-6
9-7 to 9-8
9-9
9-16
9-6 to 9-37
10-11
Figure 1 Revision.
2.4 Revision.
Table 2.3 Revision.
Figure 3.2 Revision.
Table 3.1 Revision.
Figure 3.5 Revision.
Figure 4.4 Revision.
4.6 Revision.
D10 Revision.
K45 Revision.
NOTE Revision.
NOTE Revision.
NOTE Revision.
6.2.1 Revision.
9.2 Revision.
9.3 Revision.
9.4.1 Revision and add an option speci cation.
9.4.2 Revision.
Revision.
Revision and add /E1 drawings.
10.5 Revision.
13th Dec. 2011 5-12
5-15
10-1
10-2
10-3-1
10-3-2
vi
4-1
5-13
7-4
7-6
9-2
9-5
9-6
9-7
9-10
9-11/14
10-1/12
EX-B03E_2
Manual Change No. 10-005-1E
Add note (6).
Revision and delete (Table 4.1)
Revision (E30)
Revision (Table 7.4)
Revision (7.6 title)
Revision (Speci cation changes)
Revision (Speci cation changes, add MS Code)
Revision (Speci cation changes, Table 9.3.1)
Page alignment Table 9.3.2
Revision (Speci cation changes, Table for MV)
Revision (Speci cation changes, for Explosion proof)
Revision (Speci cation changes, for Explosion proof)
Revision (Speci cation changes, for TIIS Explosion proof)
14th Mar. 2012 vi
1-1
2-6
3-3
5-5
5-7
5-8
5-12
5-13, 14
5-16
Chapter 7
Chapter 8
9-1
9-2
10-2
10-4
10-7
Chapter 12
Chapter 13
Add Warning; Wet location
Correction (Chapter No.)
Correction (Chapter No.)
Add Note, *3
Correction (unit)
Correction (time unit)
Correction (K45)
Add parameter item D40,
Correction D43
Correction (unit)
Revision (J40) Revision (HART5 and DTM menu tree)
Add HART7
Add Note
Minor amendment (ex.Chapter number)
Revision 10.1
Revision (10.5 Vortex Shedder Removal)
Add Footnote
Add HART7, Revision of Ex-proof descriptions
Revision of Ex-proof descriptions